6 brownfield (BF) sites with 10 MW grid connection each.
This infrastructure:
Allows fast BESS installation
Reduces regulatory risk
Supports scaling up to 60 MW
Grid monetization through ČEPS
Further BF exploitation
BESS Strategy
Total planned capacity: 60 MW (6 × 10 MW)
Revenue sources:
Frequency regulation
Capacity reserve
Energy arbitrage
Grid services
BESS Economics
One unit:
CAPEX ≈ €5M
EBITDA ≈ €1.5M
Payback: 3–4 years
Six units:
≈ €9M annual EBITDA
BESS is the main infrastructure asset and valuation driver.
Bridgewater Joy Residence
Co-designed by the world-renowned architect James Smith, our Bridgewater Joy residences offer top views of the nearby lake Michigan. Perfect for a small family, a professional couple, or anyone looking to set up a home office.
Pleasantview Gem Inn
Not just pleasant on the outside, our Pleasantview Gem Inn properties are especially popular among families. With underground parking and floor-to-ceiling windows, there's no shortage of natural light or space.
© 2026. All rights reserved.